Hydrology studio uses the unit hydrograph method for calculating nrcs runoff hydrographs. The equation of continuity used in all hydrologic routing as the primary equation states that the difference between the inflow and outflow rate is equal to the rate of change of storage, i. In the rational equation, t c is expressed in minutes. During that time he designed the graphical user interface, managed development, and wrote the first version of the users manual. For the case of ungauged basins, the lag time must be estimated, normally from one or more expressions relating lag time to basin physical characteristics. Pdf a general expression for basin lag time researchgate. This relationship is always used by wms to determine lag time when a method for computing time of concentration is chosen, or to compute time of concentration when a. Journal of environmental hydrology volume 8 paper 7. Rational method hydrologic calculations with excel harlan h. Mannings equation was found to be applicable for these treatments and mannings n is consistently between 0. By analyzing a large amount of measured data the scs developed an average dimensionless unit hydrograph. Runoff, in hydrology, quantity of water discharged in surface streams. A general expression for basin lag time canadian journal. The scs also found that for many cases the lag time could be related to the concentration time by the following equation.
The peak discharge is a function of the rainfall intensity, which is based on the time of concentration. This equation may be used when computing the unit hydrograph using snyders method and any of the preceding equations for lag time may. In this study, a lagtime formula for small rural watersheds in kansas was developed. Estimating basin lagtime and hydrographtiming indexes used to. Although most of the content is also included in the builtin help system, we continue to offer a real book for those of us. The science and study concerned with the occurrence, circulaton, i distribution and properties of the waters of the earth and its atmosphere, including precipitation, runoff and. Hydrological sciences journal journal des sciences hydrologiques, 572 2012 217 time of concentration. A system can be one of several hydrological domains, such as a river. This study proposes a framework for developing a probabilistic lag time plt equation by taking into account uncertainty factors, including the rainfall factor i. Watershed lag time equation calculator solving for potential. The computation interval must not be significantly less than the minimum rainfall increment on the ph record, otherwise a portion of the rainfall is lost because the. The national engineering handbook, part 630, hydrology. Kdots design manual, volume 1 part c road section kdot, 2011. The discharge of a river or stream is the volume of water that flows past a point in the rivers course per second.
The volume is measured in cubic metres m 3 and its per second so the units of discharge are cubic metres a second or m 3 s1. Calculation of time of concentration for hydrologic design. Pdf basin lag time is an important variable in the calculation of peak. Basin lag time is an important variable in the calculation of peak discharge resulting from a specified precipitation input. Perhaps the most commonly used equation for lag time is the scs equation 1972 as shown.
Time lag the peak of the outflow occurs after the peak of the inflow. This method is basically the same approach as used in the original tr20. If another method is to be used for determining time of concentration, approval from the office of hydraulics manager is required. Estimating basin lagtime and hydrographtiming indexes. The basin lag is an important concept in linear modeling of basin response. Calculation of time of concentration for hydrologic. This equation may be used when computing the unit hydrograph using snyders method and any of the preceding equations for lag time may also be used when computing the. The lag time is a parameter that appears often in theoretical and conceptual models of. Time of concentration is a fundamental watershed parameter. Modeling probabilistic lag time equation in a watershed.
Studies used to compile data for developing basin lagtime equations 6. Variation in lag time for selected events for selected 1510 streams on three. The model runs results indicate that using bransbywilliams method leads to more harmony between observed and simulated hydrographs. Lag is the lag time and t c is the time of concentration. Curve number hydrology development, status, and updates claudia c. National resources conservation service watershed lag time calculator watershed hydrology equations formulas. Kent hydraulic engineer reprinted with minor revisions, 1972 neh notice 4102, august 1972. For the purpose of this manual, hydrology will deal with. An investigation of lag times for rainfallrunoffsediment yield. Groundwater drought indicator lag time and barometric evaluation, nvca 2015 1 1.
T lag lag time in hours l length of the longest drainage path in feet s cn 10 cn curve number %slope the average watershed slope in %. Lag time in minute from bransby williams method, based on soil conservation service scs suggestion is defined using equation 2. Time between the center of mass of the effective rainfall hyetograph and the center of mass of the direct runoff hydrograph. The actual lag time values were plotted against the values obtained from the natural resource conservation management handbook lag time equation. Currently, time of concentration calculations rely on a regression equation based on the kinematic wave theory. Little information is available on the effect of reservoir boundaries on pulse test responses vela, 1977 and, to our knowledge, pulse tests in double. The hydrocad owners manual provides detailed documentation, including equations and illustrations, for all the calculations performed by hydrocad. To dimension the time axis of the uh we use the following relationships. Introduction calculation of peak storm water runoff rate from a drainage area is often done with the rational method equation q cia.
The method to compute time of concentration in a subarea is explained in this document. Coincidentally, 1m 3 s1 is the same as 1 cumec so the discharge of a river is often measured in cumecs because its a bit easier to say. Evaluate unit hydrograph time and shape parameters burst duration for the scs synthetic unit hydrograph method is estimated as twotenths of lag time. Time of concentration as defined by the ventura county watershed protection district hydrology manual is the time required for runoff to become established and flow from the hydraulically most remote part of the drainage area to the point under design. The effect of reservoir anisotropy is treated in the same way as for interference tests kamal, 1983, the dimensionless time lag and time period are simply changed according to equation 6. In hydrology, a water balance equation hydrologic equation can be used to describe the flow of water in and out of a system. Miller, development of an empirical lag time equation, journal of. Watershed lag time equation calculator solving for watershed lag time given watershed hydraulic length. William merkel, hydrology team leader, helen fox moody, hydraulic engineer, and.
Hydrology manual 4 january 2006 calculation of the time of concentration has evolved over time. National resources conservation service watershed lag time. Physicallybased estimation of lag time for forested mountainous. A design storm is selected typically an nrcs 24hr distribution. Arthur pabst, hec, and tony slocum, consultant, provided essential input to the objectoriented design of the program. The relationship between lag time and peak runoff rate can be used to model runoff hydrographs at the plot scale.
Regression analysis was used to obtain the final calibrated equation that would be used to calculate the lag. The maximum flood will generally be produced by the greatest possible rainfall of a duration corresponding to the. It is used to compute the peak discharge for a watershed. Restrictions on the use of the lag equation should be stated, although some leeway beyond the 2000 acres size limit may be justifiable. These watershed characteristics influence the shape and peak of the runoff hydrograph. The bransby williams formula for the time of concentration dates from 1922 when george bransby williams published a paper flood discharge and dimensions of spillways in india.
Math geometry physics force fluid mechanics finance loan calculator. Lag time is an essential input to the most common synthetic unithydrograph models. A unit hydrograph is constructed based on the drainage areas characteristics, i. This particular lag equation was adopted because its structure permits easy modification of the unit hydrograph based on changes in land use. With respect to drought and surface water systems, groundwater is. Unit hydrograph technical manual nohrsc the ultimate. Runoff includes not only the waters that travel over the land surface and through channels to reach a stream but also interflow, the water that infiltrates the soil surface and travels by means of gravity toward a stream channel always above the main groundwater level and eventually empties into the channel. Use of excel spreadsheets for calculations with this equation and for determination of the. Calibration of watershed lag time equation for philippine. The relationship between runoff rate and lag time and the. Time of concentration is the longest time required for a particle to travel from the watershed divide to the watershed outlet. Key words time of concentration, lag time, hydrology, flow path.
This refers back to an earlier paper by mr chamier who noted that the. The hydpar hydrologic parameters computer program is part of a family of. Abstract river basin lag time lag, defined as the elapsed time between the. Reservoir routing of hydrographs for storage uses the modified puls method. Geological survey scientific investigations report 20125110, 47 p. It also causes other problems that affect soil and water. Distributedlag models 37 to see the interpretation of the lag weights, consider two special cases. Slocum also wrote the code for the schematic representation of the basin model. In general, the hydrology calculations in pondpack, sewergems and civilstorm always work with tc, so if youre entering a user.
1174 692 740 573 830 243 600 115 265 1433 675 628 369 506 564 395 1057 759 979 1215 645 1155 341 1368 273 714 261 1493 1417 761 906 376 775 459 173 1020